Two workers using a long-handled bull float to level a freshly poured concrete slab.

Concrete · US units

Concrete Calculator — Bags vs Cubic Yards

Turn slab dimensions into bags and cubic yards. Compare bagged mix with a supplier’s bulk quote, including delivery fees and minimum orders.

Basket 2026-08-27

Slab

ft
ft
inches

Quikrete 1101 is for pours 2 in thick or more.

80 lb bags yield 0.60 cu ft; 60 lb bags yield 0.45 cu ft. Check your exact product.

Waste factor

Extra material is a planning choice for cuts, uneven areas or spillage. Quantities round up to whole packages.

$

Dated example price from August 27, 2026. Replace it with your local quote.

$

Enter the supplier’s material price per cubic yard. Add fees and minimum order below.

Finish your shopping budget

Use actual quote amounts. Leave unknown costs blank; enter 0 when they do not apply. Tax is an amount, not a percentage.

USD
USD
USD

Compare a bulk quote

Compare material and delivery on both sides. Confirm supplier order increments and access charges before ordering.

yd³
USD

Include delivery, short-load and other quoted charges.

Enter the quote details to compare.

Your shopping list

Enter your measurements to estimate quantities.

MaterialBuyCost

Known-cost subtotal

—

Unknown prices are excluded until entered.

Includes your quantities and quote notes. Nothing is uploaded.

Compare the order you will actually place

The calculator converts length × width × depth into volume, adds your chosen allowance and rounds bags up. Bulk orders use the larger of your required volume and the supplier’s minimum; confirm any order increments directly.

Include delivery and handling

A 12-by-12 slab at 4 inches requires 48 cu ft before an allowance: 80 bags at 0.60 cu ft each. Those 80 lb bags weigh 6,400 lb in total. Vehicle capacity, site access and mixing time can matter as much as material price.

What to ask the supplier

Ask for the mix specification, minimum order, delivery and short-load fees, waiting-time charges, access requirements, and tax. Slab thickness here is a calculation input, not a structural recommendation.

Work through the bagged-versus-ready-mix decision

Show the original worked calculation
Volume    = 10 × 20 × (4 ÷ 12) = 66.667 cu ft
          = 66.667 ÷ 27 = 2.469 yd³
80 lb bags = 66.667 ÷ 0.60 = 111.111 → buy 112 bags
Cost @ $5.98 (HD 110180, 2026-08-27) = 112 × $5.98 = $669.76
60 lb bags = 66.667 ÷ 0.45 = 148.148 → buy 149 bags
Cost @ $4.48 (HD 110160) = 149 × $4.48 = $667.52
Optional 10% convention = 73.333 cu ft → 123 bags of 80 lb

Formulas and manufacturer sources · Dated price references

Patio size comparison

These examples use a selected 4-inch depth with no extra allowance. Depth is an input for the arithmetic, not a design specification.

RectangleVolume80 lb bags at 0.60 ft³60 lb bags at 0.45 ft³
10 × 10 ft33.333 ft³ / 1.235 yd³5675
12 × 12 ft48 ft³ / 1.778 yd³80107

Bag weight changes handling and package rounding. Compare the cost of the whole order, including delivery and equipment, rather than assuming the larger bag is always cheaper.

Sources and product specifications
  1. The Quikrete Companies. QUIKRETE Concrete Mix product data (No. 1101). Accessed 2026-08-27. https://www.quikrete.com/pdfs/data_sheet-concrete%20mix%201101.pdf
  2. Sakrete. Sakrete High-Strength Concrete Mix technical data sheet. Accessed 2026-08-27. https://www.sakrete.com/wp-content/uploads/2024/01/Sakrete-High-Strength-Concrete-Mix-TDS.pdf
  3. FRED, Federal Reserve Bank of St. Louis. Producer Price Index by Commodity: Nonmetallic Mineral Products: Concrete Ingredients and Related Products (WPU1333). Accessed 2026-08-27. https://fred.stlouisfed.org/series/WPU1333
  4. Secondary cost blogs (not NRMCA). Unofficial 2026 ready-mix blog bands. Accessed 2026-08-27. https://latestcost.com/price-ready-mix-concrete-across-u-s-markets/

These calculators estimate material takeoff for planning. They are not engineering, structural, or code advice. Confirm spans, mixes, fastener schedules, and permits with a licensed professional and the manufacturer’s current data sheet. Local shelf prices and tax are not this index.

Build the whole budget

Add tax, tools, delivery, labor, permits, disposal and a separate contingency to your material estimate.

Open the project budget planner