Fence Calculator — Panels, Posts, and Bags

Plan panels, posts and concrete for a straight fence run. Check corners, gates and your local installation requirements separately.

Basket 2026-08-27

Run and posts

ft

8 ft bays. A 48 ft run is 6 panels and 7 posts.

ft

Hole diameter 10.5 in (3 × actual 3.5 in). Depth is 1/3 of this post.

Waste factor

Same optional 10% as the slab tool. Quikrete 1101 has no waste percent — mix per hole and round up.

$

SKU quikrete-80lb $5.98. Yield 0.6 cu ft. Fast-Setting 1004-50 is quoted on the page, not in this engine.

$

SKU pt-4x4x8-post $10.98 on 2026-08-27.

$

Fence panels are style- and zip-localized. The cell stays not entered on purpose.

Your material estimate

6 panels

7 posts · 21 bags of 80 lb · 10.5 in holes × 2.667 ft

$202.44

Bays
6 × 8 ft
Cu ft / hole
1.604
Bags / hole (1101)
3
Bags $
$125.58
Posts $
$76.86
Panels $
not entered

Engine is Quikrete Concrete Mix 1101 at 0.60 cu ft, mixed per hole. Fast-Setting 1004-50 (Nov 2025) is a quote on the method page, not this bag count.

Lay out the fence before counting posts

The calculator describes one straight run with a post at each end. Gates, corners, changes in height and connections to existing structures need their own layout. Confirm property boundaries, service locations and local requirements before planning excavation.

How spacing changes a 100-foot run

Maximum bay lengthBays, rounded upPosts for one run
8 ft100 ÷ 8 → 1314
6 ft100 ÷ 6 → 1718

These are counting examples, not a panel layout. The last bay will be shorter if full bays are used first. Check the panel manufacturer's actual dimensions and attachment details before setting post positions.

A 48-foot worked example

At an 8-foot bay length, a 48-foot run has six bays and seven posts. The tool's illustrative hole model uses a 10.5-inch diameter and a depth of one-third of an 8-foot post. That gross cylinder is approximately 1.604 cubic feet per hole. With 0.60 cubic feet per 80-pound bag and rounding per hole, it gives three bags per hole, or 21 bags.

The gross-hole model does not subtract the post's displacement. It also does not determine the required depth for frost, soil, wind or fence height. Obtain those dimensions for your site and confirm the concrete product and installation method.

Why rounding per hole changes the order

Seven gross holes total about 11.23 cubic feet. Dividing that combined volume by 0.60 and rounding once gives 19 bags; rounding each separate hole up gives 21. The calculator uses the latter planning approach. Material that can be shared between holes may reduce leftover mix, but working time and installation instructions still apply.

Price the missing parts

Include panels or pickets, rails, posts, concrete, caps, fasteners, gates and hardware, delivery and disposal. The displayed subtotal excludes any line without a price. A gate opening is not simply another standard panel.

Sources and product specifications
  1. The Quikrete Companies. QUIKRETE Concrete Mix product data (No. 1101). Accessed 2026-08-27. https://www.quikrete.com/pdfs/data_sheet-concrete%20mix%201101.pdf
  2. The Quikrete Companies. QUIKRETE Fast-Setting Concrete Mix product data (No. 1004-50). Accessed 2026-08-27. https://www.quikrete.com/pdfs/data_sheet-fast%20setting%20concrete%20mix%201004-50.pdf
  3. Sakrete. Sakrete High-Strength Concrete Mix technical data sheet. Accessed 2026-08-27. https://www.sakrete.com/wp-content/uploads/2024/01/Sakrete-High-Strength-Concrete-Mix-TDS.pdf

These calculators estimate material takeoff for planning. They are not engineering, structural, or code advice. Confirm spans, mixes, fastener schedules, and permits with a licensed professional and the manufacturer’s current data sheet. Local shelf prices and tax are not this index.

Build the whole budget

Add tax, tools, delivery, labor, permits, disposal and a separate contingency to your material estimate.

Open the project budget planner